CLCH-SVX07C-EN 21
Installation - Mechanical
Lifting and Rigging
Remove Shipping Tie-Downs
Prior to unit placement, remove the shipping tie-
downs. See Figure 4.
• Shipping tie-downs are located at each corner of the
isolation base. See Figure 5, Figure 6, Figure 7, and
Figure 8.
Figure 4. Isolator tie-down removal
Angle, isolator
tie-down (4 required)
Screw (4 per angle)
lockwasher and hex nut
Figure 5. Isolator tie-down for unit sizes 3-8 Figure 6. Isolator tie-down for unit sizes 10-30
Figure 7. Isolator tie-down removal for unit sizes 66-120 Figure 8. Belt-drive plenum fan tie down
Required
clearance
Tiedown