5. Install screws as shown in Figure 46 inserting the
appropriate screws using a powered impact gun and
taking care not to strip the screws.
6. Remove the secondary unit lifting lugs one at a time
and reinstall screws after sections are set in final
position.
Vertical SDU/Winterizer Air Handler
Assembly
To assemble dissimilar unit sizes for an indoor vertical
SDU/winterizer configuration:
1. Apply gasketing to the mating surface of the secondary
unit (see Figure 47).
2. Apply gasketing to the mating surface of the primary
unit at the bottom of the opening (see Figure 48.
3. Lift the secondary unit, follow instructions in “General
Lifting Considerations” on page 22 (see Figure 11), and
place on the black unit support brackets (see Figure 45,
p. 42. The secondary unit must be centered on the
primary unit between the black unit support brackets.
4. Install trim angles as shown in Figure 49 inserting the
10-16 x 3/4-inch self-drilling screws using a powered
impact gun and taking care not to strip the screws.
Figure 46. Install screws using powered impact gun.
Figure 47. Apply gasketing to mating surface of
secondary unit
Airflow
X25240049010
Screw: 0.313-18 x 0.875 in.
Sheet metal hex head
Airflow
Gasket
1.0 inches T x 1.0 inches W
Figure 48. Apply gasketing to the mating surface of the
primary unit.
Figure 49. Install trim angles