Trane Round In/Round Out Manual de instalación Pagina 38

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 56
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 37
Installation
38 VAV-SVN09B-EN
Select VAV control.
1. Click the ‘Profile’ drop down box in the ‘Application
Selection’ group and select the desired setting.
To set the inlet size
1. Click the ‘Box Size’ drop down box in the ‘Equipment
Options’ group and select the desired setting
Figure 28. UC400 and UC210 configuration: application selection
Figure 29. UC400 and UC210 configuration: inlet size selection
Vista de pagina 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 55 56

Comentarios a estos manuales

Sin comentarios