Installation - Mechanical
TCC Stacking Procedure
1. After bottom section of stacked arrangement is in place, ensure top is clean and free of debris.
2. Apply two layers of 0.188-inch x 2-inch gasketing around perimeter of top section layout. See
Figure 34.
3. Apply two layers of 1-inch x 2-inch tape around perimeter of openings in lower unit roof. See
Figure 34 and Figure 35.
4. Lift upper section into place carefully aligning into proper position (see Figure 35).
5. Install 0.250-14 x 0.750 self drilling screws in each hole around upper unit base perimeter.
6. Install flashing at base of top section (see Figure 35 Detail A).
Figure 34. Upper base connection to lower unit gasket.
Apply two layers of 1-inch x 2-inch
gasketing around all openings in
the lower unit roof.
Upper unit
Lower unit
Factory installed
engagement plate
Apply .188-inch x 2-inch
gasketing around lower
unit perimeter
.250 - 14 x .75 leached self-driller
screws in every hole, around upper
unit base perimeter.